『Using more of the grid we’ve already built』のカバーアート

Using more of the grid we’ve already built

Using more of the grid we’ve already built

無料で聴く

ポッドキャストの詳細を見る

今ならプレミアムプランが3カ月 月額99円

2026年5月12日まで。4か月目以降は月額1,500円で自動更新します。

概要

The US power grid runs at about 50% capacity on average — built for its worst day, underutilized every other day. As demand surges from data centers and electrification, utilities are racing to build more infrastructure. But Ian Magruder, who heads the new industry-backed Utilize Coalition, argues there's a cheaper, faster path: better use what we've already built — it will enable faster growth and bring down ratepayer bills, potentially by billions.



This is a public episode. If you'd like to discuss this with other subscribers or get access to bonus episodes, visit www.volts.wtf/subscribe
まだレビューはありません